
Stainless steel fabrication in Perth.
Perth is the longest regular freight. Crates are checked twice in Moorebank because a wrong part is a week, not an afternoon.
- Workshop
- Moorebank
- This city
- Freight and a booked install
- State
- Western Australia
- Crew
- M&C
Stainless steel fabrication in Perth is cut, folded and welded in Moorebank, on the same programme we run across Sydney. Perth is the longest regular freight. Crates are checked twice in Moorebank because a wrong part is a week, not an afternoon.
M&C is a fabrication workshop at 4/8 Cunningham Street, Moorebank, NSW 2170, Australia. Commercial kitchens, cutting and bending, architectural metalwork, on-site welding, handrails, sheet metal, and installation for Perth are drawn there before the steel is cut. Phone 0411 110 005. A quote names the lead time for fabrication and the trip.
Send the Perth sizes.
We come back with a date and a price from the Moorebank workshop, or a straight reason the scope needs another look.
